UPDATE: 10/31/13Weld County Road 13 bridge over the Poudre River construction has been extended through November 4, 2013. County Road 13 will be CLOSED during this time and re-open on November 5th. The bridge deck (i.e. top surface of the bridge) is being replaced due to poor condition of the concrete driving surface.
All message boards have been updated at nearby intersections.
10/14/13Beginning October 23rd, construction will begin on the Weld County Road 13 bridge over the Poudre River which will require CLOSING County Road 13 for approximately 10 days. The bridge deck (i.e. top surface of the bridge) is in need of rehabilitation due to poor condition of the concrete driving surface.
Understanding that Weld County Road 13 is an important road for residents and the general public traveling in and through Windsor, all reasonable efforts are being made to keep the bridge closure to the minimum amount practical. The bridge will be closed to traffic for a minimum of 10 days for concrete repair pending any weather delays. Variable message boards will be placed near the bridge prior to closure with up to date information on specific date for start of road closure. The bridge will be closed starting October 23rd. Reopening of the bridge is anticipated November 2nd.
Please contact Doug Roth, Engineer, Town of Windsor at 970-674-2435 if you have any questions or concerns.