The Town will be accepting sealed bids for the “Brunner Farm Lift Station Improvements” until 2:00 PM, local time, on Thursday March 23rd, 2023.
The Scope of Work to be performed for this contract consists of removing an existing vertical suction sanitary sewer lift station, force main, and electrical components. Improvements include wet well modifications such that the lift station is re-configured with submersible pumps. Including new force main piping, isolation plug valves, and check valves located in a separate pre-cast concrete valve vault. The existing wet well shall have a high-performance industrial coating applied to ensure future service life. Work also includes a new pre-cast concrete building to house new electrical and control equipment. The existing natural gas generator and associated connections shall be relocated from its existing location and connected to a new automatic transfer switch. The work shall require temporary wastewater bypass pumping to divert contributary sewer flows downstream until new lift station components have been installed, tested, and operation is accepted by the Town of Windsor. Limited workspace requires close coordination with the Owner and Engineer to limit impact to adjacent residences. The Contractor shall restore all impacted surfaces to pre-construction conditions at the conclusion of the installation. Detailed work scope is further identified within the contract drawings and specifications.
To receive the full bidding documents at no cost, you must complete the Bid Document Request Form (See below) and return this form via email to () .
The submission of the Bid Document Request Form is the only way prospective bidders will receive bidding documents and any future addendum. The failure to return this may result in an incomplete bid.